
The Approach
From setout
to seal.
One crew, one
standard, throughout.
The same crew runs your job from set-out to handover. No subbing out halfway, nothing lost between trades. We plan around your build programme and keep your site manager in the loop, so tiling isn't the trade that holds the job up.
We set out to the grout line, waterproof to Australian Standards, and check our own work at every stage. The result is a short defect list, a clean handover, and a subbie you can put on the next job without thinking twice.
01
Quote & programme
We measure off the drawings, work through the tile schedule and setout with you, and price it properly, with no vague allowances. You get an itemised quote and a lead time that slots into your build programme.
- Priced off the plans & schedule
- Itemised quote, no vague allowances
- Lead time to suit your programme
02
Setout & waterproofing
The invisible work that decides everything. We set out so cuts fall in the right places and line through with fixtures and other trades, waterproof wet areas to AS 3740, and screed falls that actually drain. You get certificates and photos for your compliance file.
- Setout lined through with fixtures
- Waterproofing certified to AS 3740
- Falls that drain, documented
03
Installation
Tiles go down to a checked setout: straight lines, even joints, neat mitres. We work in cleanly around the other trades on site and keep the area tidy, whether it's a single bathroom or forty across a development.
- Large-format porcelain & stone
- Coordinated around other trades
- One unit or a whole development
04
Seal & handover
We seal, detail-clean and walk the finished areas with you before handover, sorting any marks ourselves. You get a short defect list, not a long one. If anything needs a look after the fact, we come back fast.
- Seal & detail clean
- Walk-through before handover
- Quick to come back if needed